MAIN PUBLICATION :



Home » TECHNOLOGY » Wind resource estimation » Local wind resource assessment and energy analysis » The prediction of the energy production of a wind farm » Information required for an analysis

Information required for an analysis

In addition to the wind data described in the earlier sections, inputs to this process are typically the following:

  • Wind farm layout and hub height
  • Wind turbine characteristics, including power curve (the curve which plots the power output of a turbine as a function of the wind speed) and thrust curve (the equivalent curve of the force applied by the wind at the top of the tower as a function of wind speed)
  • Predicted long-term site air density and turbulence intensity (the turbulence intensity is the ‘gustiness’ of the wind)
  • Definition of the topography over the site and surrounding area
  • Definition of the surface ground cover over the site and surrounding area
<< The prediction of the energy production of a wind farm Energy production prediction methodologies >>
  Sitemap | Partners | Disclaimer | Contact

coordinated by

EWEA

supported by

Intelligent Energy Europ

The sole responsibility for the content of this webpage lies with the authors. It does not necessarily reflect the opinion of the European Communities. The European Commission is not responsible for any use that maybe made of the information contained therein.